1) Defect prevention also dig deep into the source of _______ and course of actions to be taken
- Solution
- Code
- Error
- Application
2) Each software release is considered to be a project with ____________ deadlines to be followed
- Infinite
- Tangible
- Unestimated
- Intangible
3) Estimation is pre requisite to project planning and is _________ from timeline.
- Indirectly proportion
- Directly proportion
- Same
- Different
4) The difference between software requirements and other domains requirement is that software requirements _________.
- Are missing
- Are Incomplete
- Remains the same throughout the project
- Changes throughout the project
5) Post release detects have ______ cost of fixing as comprised to other defects
- Lower
- Medium
- Higher
- None of the given
6) Testing is conducted at __________ level.
- Last
- Different
- Production
- Middle
7) ______ is the process of addressing root causes of defect to prevent their future occurrence
- Testing
- Default Detection
- Default Containment
- Defect Prevention
8) According to ________ attribute of software requirement engineering, a requirement must be necessary for the software system and should be adding some business value
- Necessary
- Complete
- Coherent
- Correct
9) Demas in demo plans is given by _________
- Programmer
- Project manager
- End user
- Assistant manager
10) ___________ helps in reducing numbers of defects but it doesn’t grantee 100% defect free product.
- Defect avoidance
- Defect prevention
- Defect detection
- None of the given