1) Defect prevention also dig deep into the source of _______ and course of actions to be taken

  1. Solution
  2. Code
  3. Error
  4. Application

 

2) Each software release is considered to be a project with ____________ deadlines to be followed

  1. Infinite
  2. Tangible
  3. Unestimated
  4. Intangible

 

3) Estimation is pre requisite to project planning and is _________ from timeline.

  1. Indirectly proportion
  2. Directly proportion
  3. Same
  4. Different

 

4) The difference between software requirements and other domains requirement is that software requirements _________.

  1. Are missing
  2. Are Incomplete
  3. Remains the same throughout the project
  4. Changes throughout the project

 

5) Post release detects have ______ cost of fixing as comprised to other defects

  1. Lower
  2. Medium
  3. Higher
  4. None of the given

 

6) Testing is conducted at __________ level.

  1. Last
  2. Different
  3. Production
  4. Middle

 

7) ______ is the process of addressing root causes of defect to prevent their future occurrence

  1. Testing
  2. Default Detection
  3. Default Containment
  4. Defect Prevention

 

8) According to ________ attribute of software requirement engineering, a requirement must be necessary for the software system and should be adding some business value

  1. Necessary
  2. Complete
  3. Coherent
  4. Correct

 

9) Demas in demo plans is given by _________

  1. Programmer
  2. Project manager
  3. End user
  4. Assistant manager

 

10) ___________ helps in reducing numbers of defects but it doesn’t grantee 100% defect free product.

  1. Defect avoidance
  2. Defect prevention
  3. Defect detection
  4. None of the given

 